lifTER Technical Specifications
| GENERAL |
| LCD Operating Temperature | -20 C to +70 C |
| Electronic Operating Temperature | -40 C to +70 C |
| Storage Temperature | -40 C to +90 C |
| ENVIRONMENTAL PROTECTION |
| PCB treatment | Conformally coated for Mild H2S exposure |
| Signal Connectors | Gold Plated |
| Power Connectors | Nickel Plated |
| Gasket | Neoprene |
| Membrane Switches | Chemical Resistant, UV Stable Polyester |
| Enclosure | Stainless Steel standard Other material optional |
| Power Source |
| Solar Panel | 2 watt, amorphous |
| Battery Backup | 20 cloudy days |
| USER INTERFACE |
| LCD | 4 x 20 Character Backlit |
| Keypad | 5 x 4 tactile membrane |
| OVERALL DIMENSIONS |
| Stainless Steel enclosure | Height | 10 inches |
| Width | 7 inches |
| Depth | 6 inches |
| Mounts by a 2 inch pipe mount, or directly to a Motor Valve. |
TELEMETRY INTERFACE
- RS232C
- baud rate selectable at 1200, 2400, 4800, and 9600 bps.
MASTER STATION COMPUTER REQUIREMENTS
- 486 style, 8M memory minimum, 2-button mouse, VGA monitor.
- Contact IAR for recommended Operating System.
MASTER STATION SOFTWARE
- masTER© allows for up to 255 well sites.
- Beam Pump-off Controllers, Alarm Status reporting, and Gas Injection
units can be combined with plunger lift automation.
OPTIONAL ITEMS
- Certification for Class I, Div II, Groups C, and D
- Special Switch Graphics
- Special Programming
Specifications subject to change without notice.
Equipment List
Material Required for Installation
- lifTER
- Solar Panel
- External Well Signal Cable
- Documentation
- Mounting equipment (bolts/brackets)*
- Necessary Tubing for Solenoid Valve*
- Solenoid Valve** (Part #BO6-0299)
- Arrival Sensor** (Part #BO2-0271)
Notes:
* Equipment not provided by IAR.
** Equipment available from IAR, but must be ordered separately.
Optional Equipment
- Second Solenoid Valve (Part #BO6-0299)
- Telecommunications package (Cellular, Radio, or Satellite)
- High, Low, and Sales Pressure Switch Gauges
- Tubing, Casing, and Sales Pressure Transmitters (Part #BO6-0325)
- External Communications Cable (Part #BO7-0104)
- Gas Flow Computer
Contact IAR Sales to see if plunger lift is an applicable method for your production needs.
tersales@ter-usa.com